Model

BJ-0809 Assembly equipment for rear mounting of balance lever

The assembly line provides precise process control and real-time monitoring. High-speed production is achieved through dual-station assembly. Specialized mechanisms are designed for challenging assembly steps. Durable and adjustable tooling design makes it applicable to the fully automated front and rear assembly of suspension ball joint units.

The Main Process

Performance parameters:

Equipment size 3934*1550*2165mm 

Beat 8S

Power supply voltage Front three-phase four wire AC380V/rear single-phase 220V 

Air pressure 0.4-0.6 MPa  


Main Process Flow:

Ball Joint Front & Rear Auto-Assembly Process

Front Assembly

-->Manual Loading & Resin Bearing Oiling

-->Shell & Cover Placement 

-->Ball Pin Lifting & Resin Bearing Pressing

-->Cover Positioning & Placement

--> Servo Riveting/Rotary Riveting


Rear Assembly

-->Shell & Large Snap Ring Loading

-->Torque Testing

-->Ball Pin Oiling & Guide Sleeve Transfer

-->Dust Cover Installation (with/without frame) 

-->Guide Sleeve Removal

-->Large Snap Ring Pressing 

-->Guide Sleeve Return & Unloading.


Online Message

For More Information About This Product, Contact Us Immediately
Code